# DuPont schedule explained

> The DuPont schedule is a 28-day rotation of 12-hour shifts: four night shifts, three days off, three day shifts, one day off, three night shifts, three days off, four day shifts, then seven days off in a row. Each worker averages 3.5 shifts a week, and four crews together cover every hour of the week.

Canonical page: https://rotalark.com/guides/dupont-schedule

## How the DuPont rotation works

The DuPont schedule, usually credited to the chemical company of the same name, mixes day and night blocks inside one four-week cycle. Each worker has 14 shifts in 28 days: seven nights and seven days. Four crews start the cycle one week apart, so every day and every night always has one crew on duty.

Weekly hours vary a lot. Starting on a Monday, week 1 has four shifts, week 2 has six, week 3 has four and week 4 has none. With 12-hour shifts that is 48, 72, 48 and 0 scheduled hours, or 42 hours a week on average.

## DuPont schedule example rota

The table shows one full cycle starting on a Monday, which is how RotaLark's built-in DuPont rotation begins.

*DuPont rota, one 28-day cycle*

| Week | Mon | Tue | Wed | Thu | Fri | Sat | Sun |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Week 1 | Night | Night | Night | Night | Off | Off | Off |
| Week 2 | Day | Day | Day | Off | Night | Night | Night |
| Week 3 | Off | Off | Off | Day | Day | Day | Day |
| Week 4 | Off | Off | Off | Off | Off | Off | Off |

Because the cycle is exactly four weeks, the same weekdays line up every cycle. Week 4 is the seven-day break that makes DuPont popular. The hardest moment is in week 2, when one day off separates the end of a day block from the start of a night block.

## How to set up the DuPont schedule in RotaLark

1. Open the Rotations tab and choose DuPont. It is included with RotaLark Pro.
2. Tap Apply. RotaLark fills the next 90 days from the coming Monday with both night and day shifts: 46 shifts in total.
3. Confirm the replacement. Existing entries in those 90 days are overwritten.
4. Swap single days with Quick assign if you trade a shift or pick up overtime (OT).
5. Open Insights to see hours, night shifts and weekend shifts for each month.

The built-in rotation starts at the first night block. If your crew is at a different point in the cycle, scan or type your actual rota rows on the import screen; see the [rota scanning guide](https://rotalark.com/guides/scan-rota-to-calendar).

In version 1, shift times come from RotaLark's built-in definitions: day shifts run 07:00 to 19:00 and night shifts 19:00 to 07:00, each with a 60-minute unpaid break, so every 12-hour shift counts as 11 paid hours. You can change the hourly rate and pay multiplier for each shift type in Settings, but not the start and end times.

## Counting nights and pay on DuPont

Because half of the DuPont shifts are nights, it helps to see them separately. RotaLark's Insights tab counts night shifts for each month alongside total hours and weekend shifts. With Pro, estimated gross pay applies each shift type's own rate and multiplier; night shifts start with a 1.2× multiplier, which you can change in Settings to match your contract.

The [shift pay calculator guide](https://rotalark.com/guides/shift-pay-calculator) walks through the formula with a worked example.

## Pros and cons of the DuPont schedule

- Seven consecutive days off once every four weeks, long enough for a real holiday without using leave.
- Equal numbers of day and night shifts across the cycle.
- The six-shift week is the heaviest stretch on any common 12-hour rota.
- Switching between days and nights within the same cycle can be hard on sleep.

If you prefer a rota that repeats every two weeks, compare the [Panama 2-2-3 schedule](https://rotalark.com/guides/panama-2-2-3-schedule).

## Frequently asked questions

### How many hours a week is the DuPont schedule?

It averages 42 scheduled hours a week with 12-hour shifts, but individual weeks range from 0 to 72 hours: 48, 72, 48 and 0 across the four weeks of the cycle.

### When do you get seven days off on DuPont?

Once every 28 days, straight after the block of four day shifts. In a cycle that starts on a Monday, it is the whole of week 4.

### Does RotaLark count night shifts separately?

Yes. Insights shows the number of night shifts in each month. With Pro, pay estimates use the night shift's own rate and multiplier.

### Can I start the DuPont rotation on a different week?

The built-in rotation always starts at the first night block on the coming Monday. To start at another point, import your rota rows instead, or adjust days with Quick assign.

## Related guides

- [Panama 2-2-3 work schedule](https://rotalark.com/guides/panama-2-2-3-schedule)
- [4 on 4 off shift pattern](https://rotalark.com/guides/4-on-4-off-shift-pattern)
- [Shift pay calculator: estimate pay from your rota](https://rotalark.com/guides/shift-pay-calculator)
- [A shift calendar app for nurses](https://rotalark.com/guides/shift-calendar-for-nurses)
- [All shift pattern guides](https://rotalark.com/guides)